St James Hospital Energy Centre & Site Wide Distribution

St James Hospital work
Client Duration Key Fact Valve
VITAL ENERGI 63 Weeks 1 KM of Piped Services £ 3,000,000

PIMS were delights to work with VITAL Energi at the prestigious St James Hospital and help to revitalise their Energy generation system.

Removal of Existing Equipment

Gas fired Turbine CHP

HRSG, inclusive of all ducting, supplementary burner.

Externally mounted heat rejection coils

Redundant gas compressor and vessels.

St James Hospital image 2

Design, Installation, Connection and Commissioning

All Civil works associated with the project.

4.5MWe Gas Fired packaged Turbine complete with ancillary equipment.

25tonne HRSG steam boilers delivered and commissioned complete with supplementary gas burner, exhaust by-pass valve & exhaust silencers.

Installation of new 24,000ltr internal volume hotwell.

Installation of 43M high Chimney.

Installation of new duplex water softener plant with a capacity of 24m³/hr.

Site wide distribution of 1 kM of DN 150 LTHW F&R pipe work.

Connection and proving system to 10 dispersed plantrooms.

Electrical, Controls and metering equipment.

St James Hospital image 1

Strategic Elements

Maintaining various crucial operational areas whilst changing over systems

Installation of large and in the case of the Chimney high plant in tight inaccessible places.

Integration of a new SCADA system into the existing Hospital control arrangement.

Successes

Modelling the Installation in Autodesk Plant 3D enabling the client and site operatives to walk around a virtual installation.

A great site team that continually worked hand in hand with the client’s representatives.