Client | Duration | Key Fact | Valve |
---|---|---|---|
VITAL ENERGI | 96 Weeks | Pipework & Flue Bridge | £ 3,100,000 |
A challenging yet great project for PIMS in Scotland, which included a large amount of prefabricated plant and steelwork. BG01 publication “Guidance on safe operation of steam boiler houses” used a picture of the completed project as their front cover.
Enabling Works
Steam Shutdowns to enable future Energy Centre connections.
Installing and proving a temporary steam boiler and services.
Decommission and removal of existing Gas Turbine and Waste Heat Boiler Plant.
Design, Installation, Connection and Commissioning
Prefabricated & Installation of 2 No. 15,000L Hotwells & platform incorporating pumpsets & Pressurisation units / vessels.
New 11 Tonne Steam Boiler and associated services.
New 9 Tonne Combination Boiler and associated services.
Chimney & interconnecting flues.
LV panel, related electrical cabling and SCADA system.
Integration with 4.0 MW CHP complete with ancillary equipment including dry air coolers.
Installation, connection & commissioning of new plate heat exchangers in 5 plantrooms and the LTHW piped services to each.
All civil engineering works.
Strategic Elements
Energy centre sited on a first floor, new boilers needed special steel support design.
Services crossing a busy access road to connect to a CHP Enclosure which was located away from the Energy Centre.
Successes
Project finished on time and budget.
A new great working relationship with the Tayside Hospital Trust.